Timely
execution of mega-projects in construction Industries has led to
paradigm shift with introduction of Batching plant and its product viz; RMC However
two basic inputs to RMC viz cement and Fly ash are received at site in Bulkers
or in bags The optimum productivity of Batching plant depends on how fast the
cement / fly ash is received at site and is transferred to Batching Silo.
PNEUCON has designed, manufactured and supplied
user friendly system mounted on a skid; it will have options to both modes of
Cement / fly ash input i.e. loose in Bulkers or material received in Bags. Conveying from Bulker to
Main Silo is achieved by diverting the voluminous air flow at around 1 Kg /Cm2
Pressure. The bulker is aerated and pressurized. Opening of Bottom Valve allows
cement / fly ash to fall directly in dispatch pipe. The air flow carries the
material to the main Silo.
The
conveying rate achieved is 30 - 32 Tons per hour. When cement / fly ash is received at
site in Bags, then they are manually taken to a hopper. Bags are slit and loose
material is dumped in to the hopper. A specially, designed screw feeder and low
pressure air insertion ensures measured flow of material in to the discharge
pipe line The cement / fly ash dropped in discharge pipe are pushed ahead to
main silo with the pressure of 1 Kg/Cm2. The transfer rate achieved is 12 to 15
Tons / Hour for this mode the same operational procedures remain common for
lime handling systems also.
The
cement handling systems in form of:
·
Screw
Pumps (Screw Feeders)
·
Lime
Handling Units with Silos And many other
For further details visit our website http://pneucon.net
No comments:
Post a Comment